Have to give my first 300 amp service estimate.
Never did one before.
Thinking of bringing a single set of conducters to the meter pan.
I have to check with the POCO but I believe they make a meter pan with dual lugs were I can connect 2 feeds to 2 -150 amp panels.
Is this the standard way or could I do it better?
Also Is it the worth stepping it up to a 400 amp since 300 amp really isn't a common service?
Any suggestions will be helpful.
Thanks