chris kennedy
Senior Member
- Location
- Miami Fla.
- Occupation
- 60 yr old tool twisting electrician
I was at a facility today and witnessed material processing I had never seen. This is a C&D MRF (construction and demolition material recovery facility).
I am very familiar with these as I have been building and maintaining these for at least 10 years now.
Today they were processing only concrete and were starting and stopping 2 30hp vibratory finger screens at around 1 minute run time and 30 seconds rest time.
Normal C&D processing has these running continuously all day resting at lunch time only with the exception of stoppages for jams and such.
I'm concerned the heat generated at motor starting is not adequately being dissipated before the next start. DOL starting method.
Anyone else see this as a potential problem?
Attached is a crappy video taken today.
I am very familiar with these as I have been building and maintaining these for at least 10 years now.
Today they were processing only concrete and were starting and stopping 2 30hp vibratory finger screens at around 1 minute run time and 30 seconds rest time.
Normal C&D processing has these running continuously all day resting at lunch time only with the exception of stoppages for jams and such.
I'm concerned the heat generated at motor starting is not adequately being dissipated before the next start. DOL starting method.
Anyone else see this as a potential problem?
Attached is a crappy video taken today.