320 Milbank with Two Service Feeds--One for House & One for Separate Pole Building
I have been researching this issue for some time, and have consistently received conflicting information. I have a Milbank 320 (U1797-O-K3L-K2L) meter base with with double load side lugs. One set of load lugs are now being used with 4/0 copper running to my home's 200 amp breaker box located in the basement.
I recently built a separate pole building and I installed a 200 amp breaker box in the new building. I buried 3" conduit between the 320 meter base and the pole building, planning to pull three 4/0 copper cables, connecting them to the other load lugs. I wasn't planning on using any exterior service disconnects, only the breaker box main breakers. Do you see any issue with my plan? Served by AEP.
Thanks in advance.
I have been researching this issue for some time, and have consistently received conflicting information. I have a Milbank 320 (U1797-O-K3L-K2L) meter base with with double load side lugs. One set of load lugs are now being used with 4/0 copper running to my home's 200 amp breaker box located in the basement.
I recently built a separate pole building and I installed a 200 amp breaker box in the new building. I buried 3" conduit between the 320 meter base and the pole building, planning to pull three 4/0 copper cables, connecting them to the other load lugs. I wasn't planning on using any exterior service disconnects, only the breaker box main breakers. Do you see any issue with my plan? Served by AEP.
Thanks in advance.