Is anyone aware of an exception to NEC 352.26 for duct banks? Our pull calculations show no issue with the added bends due to oversized conduit but the EOR will only sign off with a variance for the AHJ. Unfortunately the job schedule does not allow for us to apply for a variance and wait for a decision.