Have a existing 225A/3p breaker feeding a existing 225A panel in a tenant space (no feeder is existing). We want to remove the panel and use the 225A/3p service from the meter center to feed a single phase 200A enclosed circuit breaker which will feed a piece of medical equipment.
Is it legal to not use the 3rd leg and only pull two legs from the breaker to the enclosed circuit breaker?
Alternatively my idea was to remove the breaker in the meter center and stab on a new 200A/2p breaker onto the side of the meter center and feed the 40KW single phase load that way.
Any help would be great!