H huntr52 Member Location Houston Tx Jun 13, 2013 #1 is it typical practice to install a 4 wire disconnect on the primary side of a transformer or just require that neutral be grounding during testing outages
is it typical practice to install a 4 wire disconnect on the primary side of a transformer or just require that neutral be grounding during testing outages