richwaskowitz
Senior Member
- Location
- Shelby Twp. MI, near Detroit
How many of you have ever run 200 amp service entrance cable (4/0 AL) in through the back of a standard main panel (3 1/2 inches deep)? It is my understanding that this is in violation of the minimum wire bending space provision of 373-6 (1999) where it states that 4/0 requires 4 inches of bending space.