Customer has existing 4- 4 gang meter can banks same building same side of building. Each 4 gang bank has its own service lateral. Will all the services require to have common ground? Bond for Building steel also exist does these need to.also extend into.each service disconnect. The current situation is that they cut the wiring short behind the wall and its not accesible. Just trying to determine best approach for customer.