Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
Hello. Have 40- 4" RMC PVC coated conduits running on roof about 500'. Would derating need ot be taken into consideration and how would that be calculated? Below is ther info. 500' on roof and 170' inside building.
Trip (A) | Modeled Length | Wirefill |
2700 | 670' - 7 1/4" | 4#600MCM CU+1#500MCM G |