I just saw a public service at a building with (2) 200 amp 3 phase load centers. The 2 panels are fed from a 400 amp breaker in a meter stack. Instead of installing a 400 amp panel with parallel 3-0 THHN, they ran one set each to each panel. Is this code? This is a public service at a commercial building.