Chopper143
Member
- Location
- Tyler, Texas USA
I had electrician install a meter base with a dg225 Eaton safety switch fusible link single
phase 240 150ft from house do to power company and tree issues. He ran 2 runs of Wesleyan cable I believe 350/350/4/0 to the 2-200 amp panels at house underground service.There are 2 ground rods at safety switch 5ft apart and tied into neutral there and also 2 ground rods at house for 2 200 amp panels. The bonded strap to neutral is hooked up in panels at house is this correct?
phase 240 150ft from house do to power company and tree issues. He ran 2 runs of Wesleyan cable I believe 350/350/4/0 to the 2-200 amp panels at house underground service.There are 2 ground rods at safety switch 5ft apart and tied into neutral there and also 2 ground rods at house for 2 200 amp panels. The bonded strap to neutral is hooked up in panels at house is this correct?