We were running a 200 amp service 120/240V single phase then setting a 200 amp ATS to a 22kva Generac Gas Generator. All was fine. Now, the HO blew up the calculated load to around 300 amp so were gonna run a 300 amp underground service now to a 320/400 amp meter base and set 2 -200 amp main breaker panels. The whole place does NOT need to function off the generator (and it has load shedding anyhow) I had a plan but no I'm doubting it. Is there any way possible to make this happen using just the 200 amp ATS the generac came with or do we need to find a 400 amp ATS now ?