Planning to install 400 amp service like this
run 3 500 kcmills in 2 1/2 pipe to my 320 meter base,then put 2 200 disconnects on either side to fed 200 panels on is ide of houE
then run # 4 ground from each panel to ground rod and bond
any other suggestions ?
run 3 500 kcmills in 2 1/2 pipe to my 320 meter base,then put 2 200 disconnects on either side to fed 200 panels on is ide of houE
then run # 4 ground from each panel to ground rod and bond
any other suggestions ?