What is the correct way to do a 400 amp service with 2 200amp panels? Or a 600 amp with 3 200amp main breaker panels?
Do I need a gutter above the panel with taps, or can I run 3/0 from each panel to the whether head?
What about grounding and bonding two or 3 main panels?
The service in question is 3 phase.
Do I need a gutter above the panel with taps, or can I run 3/0 from each panel to the whether head?
What about grounding and bonding two or 3 main panels?
The service in question is 3 phase.