I'm having an issue on a construction project where the contractor purchased a 480/240V single phase transformer to feed a 120/208V, 3 Phase Panel. I'm making the contractor change out transformers, but has anyone seen this in the field before. All the loads are 120V. Basically if the 3 phase panel were to remain just 1 of the 3 phases would be energized, the other 2 would not be used. Is there a code violation with that? besides it just looking silly.