dpconstr
New User
- Location
- Slippery Rock, Pa
- Occupation
- Builder/Teacher
I’m currently running a job where the electrician says he can utilize 2 existing 2.5” sch40 conduit to run 480v 3 phase configured this way:
Phase A and B 750mcm Al XHHW with ground - conduit 1
Phase C 750mcm Al XHHW with ground - conduit 2
Since I’m overseeing everything and don’t needs issues later, is code compliant?
Phase A and B 750mcm Al XHHW with ground - conduit 1
Phase C 750mcm Al XHHW with ground - conduit 2
Since I’m overseeing everything and don’t needs issues later, is code compliant?