We are using 3C W/G 500MCM, 2000ft, 480V power cable to feed one of our 100hp pump motors. Around 1800ft of the cable is on pipe rack and the remaining 200ft will be drop down from pipe rack to underground duct bank. UG duct bank will have a 6" conduit.
We want to splice down the cable to 3C, 4/0AWG at the end of the pipe rack, due to space restrictions at the motor junction box. Could we splice down the cable to 4/0, for almost a length of 200ft? Any suggestions on what the code implicates.
We want to splice down the cable to 3C, 4/0AWG at the end of the pipe rack, due to space restrictions at the motor junction box. Could we splice down the cable to 4/0, for almost a length of 200ft? Any suggestions on what the code implicates.