would like to have a explanation of this code article. we have a storage shed with a panel inside from this panel i have refed an existing above ground gas tank used to refuel equipment. pvc underground change to rigid sealoff atfirst joint out of ground. inspector says i also must follow 501-16a is this required when equipment grnd is installed in this branch circut