517.33(A)(9) ? needed for effective hospital operation
I was reviewing drawings today and noticed several lighting and cubical circuits in a loading dock/receiving/storage area are on critical power. 517.33 is very detailed on what is allow (1)-(8) and then (9) opens the door with a vague statement. ?? needed for effective hospital operation?
So my question, do you consider a receiving/storage area as ?? needed for effective hospital operation??
I was reviewing drawings today and noticed several lighting and cubical circuits in a loading dock/receiving/storage area are on critical power. 517.33 is very detailed on what is allow (1)-(8) and then (9) opens the door with a vague statement. ?? needed for effective hospital operation?
So my question, do you consider a receiving/storage area as ?? needed for effective hospital operation??