525.20 (g) & 400.8 (7)

Status
Not open for further replies.

up&down guy

Member
Location
Richmond, VA
In a carnival midway situation would using hot asphalt and forming a speed bump comply with the intent of the Code to cover/protect/reduce tripping hazards of the wire (multiple 0/00 wire)? Is this a proper burial?
 
up&down guy said:
In a carnival midway situation would using hot asphalt and forming a speed bump comply with the intent of the Code to cover/protect/reduce tripping hazards of the wire (multiple 0/00 wire)?

I am pretty sure melting the cable jacket is not the intent of the code. :wink:


I recommend using something like this

lbk5chhd01lg.jpg


Link To the Above

Many Choices
 
up&down guy said:
An excellent choice, I believe they are thinking asphalt is the cheaper way to go.

IMO asphalt would be a violation, I don't believe you will find 'embedded with asphalt' as a permitted use of flexible cord in 400.7 or 400.8
 
iwire said:
IMO asphalt would be a violation, I don't believe you will find 'embedded with asphalt' as a permitted use of flexible cord in 400.7 or 400.8
I'm pretty sure I've never seen the words "inbedded in asphalt" any place in reference to flexible cord. PS Thanx for the John Lee Hooker vid!:smile:
 