Is it required that a new 5kv shielded cable be meggered or hi-pot testing when it arrives on the job site and if so which method would be correct? Also should 600v cable be tested as well?
Is it required that a new 5kv shielded cable be meggered or hi-pot testing when it arrives on the job site and if so which method would be correct? Also should 600v cable be tested as well?
Is this not a good question!! I'm guessing no one does this! Wow!