electrician put a 12 cir. rain tight breaker panel below the meter socket the line wires were hooked to the main lug inside the panel, no main breaker.3 two pole breakers were installed,sub feeding panels in the house.my question is,it has the capability of having more than 6 throws of the hand if you added the breakers, is this practice in violation of the nec?