tbullion
Member
- Location
- Delaware, OH
Hi,
I have a customer who is demolishing one of there outbuildings that was used as an office building and it had a 600 pair feed cable for the phone lines to run over. The cable is currently demoed back to a pole. Are they alright abandoning that cable as is? Or does it need to be grounded in some way? I've looked through the NEC code book and the only reference I can find is 800.25 (B). My concerns is that aerial cable left on a pole is basically an antenna/lightning rod... They don't want to pay to have it demoed all the way back to the Main Office. Any input is appreciated.
I have a customer who is demolishing one of there outbuildings that was used as an office building and it had a 600 pair feed cable for the phone lines to run over. The cable is currently demoed back to a pole. Are they alright abandoning that cable as is? Or does it need to be grounded in some way? I've looked through the NEC code book and the only reference I can find is 800.25 (B). My concerns is that aerial cable left on a pole is basically an antenna/lightning rod... They don't want to pay to have it demoed all the way back to the Main Office. Any input is appreciated.