I have a situation where a existing pool appears to have no bonding {based on there being no bond wire at the pump and high resistance between the ladder "leg buckets" (I don't know the proper term)}.
I know the equipotential grid requirements have changed from Code to Code, but , in the last 20 years has there been a Code cycle where the metal parts, wet niche lighting, etc. ?
I know the equipotential grid requirements have changed from Code to Code, but , in the last 20 years has there been a Code cycle where the metal parts, wet niche lighting, etc. ?