When the PV output is connected to the supply side of the service disconnecting means, is there a size limitation to the PV system you can connect?
I did not see any requirements in Article 230 in terms of splicing/tapping the conductors. But I'm thinking that the max size is limited by the current carrying capacity of the incomming service conductors.
I did not see any requirements in Article 230 in terms of splicing/tapping the conductors. But I'm thinking that the max size is limited by the current carrying capacity of the incomming service conductors.