700.9(b)(5) ? (2008 nec)

Status
Not open for further replies.

charlie b

Moderator
Staff member
Location
Lockport, IL
Occupation
Semi-Retired Electrical Engineer
A backup generator with its own generator breaker serves a small distribution panel. The DP is main lugs only, and has two breakers. One breaker serves an Emergency transfer switch, and the other serves an Optional Standby transfer switch.

Would this violate the (new for 2008) requirements of 700.9(B)(5)?
 
Status
Not open for further replies.
Top