A anbm Senior Member Location TX Occupation Designer Feb 24, 2009 #1 To comply with 700.9(D)(1)... What is the most cost efficiency method to run emergency feeder between electrical room #A to room #B in a high rise building if each elec. room locates at different floor and they are not stack?
To comply with 700.9(D)(1)... What is the most cost efficiency method to run emergency feeder between electrical room #A to room #B in a high rise building if each elec. room locates at different floor and they are not stack?
barbeer Senior Member Location Pinellas County, FL Feb 26, 2009 #2 I personally have not used it, alot of posts on this forum praise MI cable.