Would it be code compliant to use the calculated service load as the basis for sizing a stand by generator to meet the requirements of 702.5 (B) (2) (a)? How do AHJ's actually determine if the generator is going to be overloaded? Is a test run made with everything connected operating at 100%? The reason I ask is that I have spoken with several contractors who tell me that as long as the unit starts and shuts down it's approved.. The answer I get when I ask about load shedding is" we just tell the customer to use common sense". I've also heard "when the breaker trips on the generator you are trying to run too much".Is this a grey area that is loosely enforced?