We are in the process of having a study . MY company feels as long as you have ppe on everything is fine even if the switchgear is rated at 40cal.
They want to open the rear of the metal switchgear 480v 4000amp. to get the size of the feeders going out to the mcc that are in different buildings . I informed them that all the sizes are on the online we have which are 25 years old. Also each feeder that lands in a mcc at a different location lands on a main cb for the mcc. My thinking is to work at a safer level and just open up the bucket door and record the sizes of the cables.
Does anyone have an opinion if this is a safer way to collect the cable sizes then opening the rear of the energized swichgear ? All cables leave the building underground to their locations. We will get their lenghts also.
Either the people doing the study labeled the switchgear work at hazard 4 or my company did.
Any imput would be helpful
They want to open the rear of the metal switchgear 480v 4000amp. to get the size of the feeders going out to the mcc that are in different buildings . I informed them that all the sizes are on the online we have which are 25 years old. Also each feeder that lands in a mcc at a different location lands on a main cb for the mcc. My thinking is to work at a safer level and just open up the bucket door and record the sizes of the cables.
Does anyone have an opinion if this is a safer way to collect the cable sizes then opening the rear of the energized swichgear ? All cables leave the building underground to their locations. We will get their lenghts also.
Either the people doing the study labeled the switchgear work at hazard 4 or my company did.
Any imput would be helpful