My bedside copy of the NEC happens to be'08.
Dairy customer with an 800 amp 480v generator that went TU. Oil in the water. They use it for load shedding and standby. Salesman called today confirming the crane will be onsite to remove old and set new and informs me that the install might be a bit more involved than discussed. I'll need some extra wire. He has the splices.
That was an 800, right?
Yes. The new one is 1200. Well turn the setting down, though.
I see this set up as needing GFP plus somewhat larger than two 500s per phase.
Yes?
Dairy customer with an 800 amp 480v generator that went TU. Oil in the water. They use it for load shedding and standby. Salesman called today confirming the crane will be onsite to remove old and set new and informs me that the install might be a bit more involved than discussed. I'll need some extra wire. He has the splices.
That was an 800, right?
Yes. The new one is 1200. Well turn the setting down, though.
I see this set up as needing GFP plus somewhat larger than two 500s per phase.
Yes?