S sleepy Senior Member Feb 25, 2005 #1 from the new metering sections i want to use emt to the panels on each floor. what else is accepted by the code. right now the building is empty and gutted. we do have two full length shafts.
from the new metering sections i want to use emt to the panels on each floor. what else is accepted by the code. right now the building is empty and gutted. we do have two full length shafts.