Guys, we recently received an updated schedule for A/C requirements from Lennox. The MCA for a 4 ton unit is now 33a and it is calling for a 50a 2P breaker for the circuit. Can we run #8 for this circuit based on the MCA or do we need to run #6 to match the breaker rating?