I am an apprentice electrician, and will humbly ask a, I hope not a dumb question! I am installing a 200a underground service, panel at my home. At the pole, there will be a service disconnect (per the utility). Now, does this make my 200a panel a sub-panel. Second, the utility has a grounding connector comming down (yes, down) the pole and bonded to the nuetral (line side). Do I need to drive a ground rod at the pole, to bond to the load side, then underground 100' to the house, or, drive a ground rod at the house, and bond at the panel as usual, sounds as if it would accomplish the same thing. I would appreciate any feedback. Thanks in advance. Don