Planning on installing a 4160/480 750kVA XFMR and double lugging it to a MCC 20ft away and a SWBD about 1,300ft away via duct banks. The engineer I am working with has added a Main Lug SWBD on the secondary side of the XFMR then feeding the MCC and SWBD. I'm not sure why?
Can anyone tell me why, or point me in the right direction?
Can anyone tell me why, or point me in the right direction?