Old Drummer
New member
Just need to see where the NEC requires that no wiring should be abandoned but shall be removed.
Just need to see where the NEC requires that no wiring should be abandoned but shall be removed.
Hope this explain the dilema.![]()
I suggest you also take a look at:
110.12 Mechanical Execution of Work.
It happend anyone can failed inspection based only on this section requirements.
That is quite a stretch of the imagination.
...on what?That depends......
I suggest you also take a look at:
110.12 Mechanical Execution of Work.
It happend anyone can failed inspection based only on this section requirements.
That is quite a stretch of the imagination.
That depends......
...on what?
On the conditions of the work performance and wormanship alone (clean place)and sometimes (perhaps) on the Inspector
Just need to see where the NEC requires that no wiring should be abandoned but shall be removed.
Nothing ventured, nothing gained.Nice try Larry:grin:
The answer to is provided in 372.13
I respect healthy arguments and conversation.
It was a pleasure talking to you my friend. Believed me: The reason behind 110.12 being in the code is only for the safety reason.
I am sure i do not have to explain that