I am looking for the code reference which requires an underground installation greater than 4kv to be encased in concrete. I thought this was in the code a few cycles back but I can not find in 08
I am looking for the code reference which requires an underground installation greater than 4kv to be encased in concrete. I thought this was in the code a few cycles back but I can not find in 08