Fordean
Senior Member
- Location
- New Jersey
- Occupation
- Electrical Contractor
The pools have epoxy legs Supposedly no metal But the shell is metal Shell comes with one #4 bond tail How do u supposed to do the 4 points around pool
Pool installer wants to fully finish pool
I asked to let me drill 4 holes in metal shell at the low spot where they make the sand cove for liner and install four lugs with nuts behind liner but in the cove sand area So liner does not touch bolt nuts He said no one does that
Pool installer wants to fully finish pool
I asked to let me drill 4 holes in metal shell at the low spot where they make the sand cove for liner and install four lugs with nuts behind liner but in the cove sand area So liner does not touch bolt nuts He said no one does that