TPBosworth
Member
A client is having an above-ground pool installed in the middle of their yard, which is all grass. There will NOT be a deck or walkway around the pool (at least at first). In addition to the normal bonding requirements - 4 points on metallic frame; skimmer bond; filter motor - is it also necessary to create an equipotential ring of #8 copper around the pool, dug into the lawn 4"-6" in order to meet requirements of 680.26(B)(2)?