shujath36
Member
- Location
- Saudi Arabia
I am designing some factory project having machine details as mentioned in attached file. The production area has six machines. AC test transformer has 100kva capacity.
Since i have limited information. I was thinking on the use of transformer here like is it for supply for other machines or its a seperate thing.
So can any body guide here, shall i give seperate 380v 3 phase supply to primary of 100kva load and seperate for other machines or should the load for machines be given by transformer.
The supply for production area will come from main distribution panel connected to 13kv/380v system.
Sent from my SM-N9005 using Tapatalk
Since i have limited information. I was thinking on the use of transformer here like is it for supply for other machines or its a seperate thing.
So can any body guide here, shall i give seperate 380v 3 phase supply to primary of 100kva load and seperate for other machines or should the load for machines be given by transformer.
The supply for production area will come from main distribution panel connected to 13kv/380v system.
Sent from my SM-N9005 using Tapatalk