Ac test transformer in factory

Status
Not open for further replies.

shujath36

Member
Location
Saudi Arabia
I am designing some factory project having machine details as mentioned in attached file. The production area has six machines. AC test transformer has 100kva capacity.

Since i have limited information. I was thinking on the use of transformer here like is it for supply for other machines or its a seperate thing.

So can any body guide here, shall i give seperate 380v 3 phase supply to primary of 100kva load and seperate for other machines or should the load for machines be given by transformer.

The supply for production area will come from main distribution panel connected to 13kv/380v system.


Screenshot_2017-04-23-21-11-34.jpg

Sent from my SM-N9005 using Tapatalk
 

shujath36

Member
Location
Saudi Arabia
Oh the file is compressed by app.

It has machines namely
1. Injection machine 45kw
2. Crimping machine 3kw
3. Marking machine 10kw
4. Tensile testing machine
5. Impulse voltage testing
6.AC test transformer 100kva.

Sent from my SM-N9005 using Tapatalk
 

steve66

Senior Member
Location
Illinois
Occupation
Engineer
I don't think there is any way anyone could know, except the person who sent that data.

I think you need to ask that person.
 