rrc14
Member
- Location
- Anchorage, AK
- Occupation
- Engineer
When adding loads by phase on a panel-board schedule how do you handle the 2-pole circuit breaker loads? Lets say for instance the single A-phase loads add to 12kVA, and the single B-phase loads =13.2kVA, and single C-phase loads = 10kVA. How do you calculate the two-pole loads? Would one split the kVA between the two phases? Lets say the 2-pole load was a stove rated at 1.5kW would you figure 750W per phase in the total per phase calculations? 
Thanks,
Thanks,