I want to feed three buildings with one 320 amp service. The meter panel will be moved to a well shed in between the house and the shop. The house uses less than 100 amps at any given time, the shop will be somewhere around 100-120 amps at most and the well shed should be under 80 amps. What is the best way to distribute power to all three buildings?