Open Neutral
Senior Member
- Location
- Inside the Beltway
- Occupation
- Engineer
A friend & fellow EE is remodeling; AHJ required AFCI and GFI's. He passed the electrical inspection but asked two questions:
I'm a failure; I could answer neither, even after studying the FAQ. Can folks here help redeem me?
- What's the backstory on the 5->30mA relaxation vs GFI's?
- How is he supposed to run his Skil Saw and/or hand drill when they trip the AFCI every time?
I'm a failure; I could answer neither, even after studying the FAQ. Can folks here help redeem me?