Davebones
Senior Member
- Location
- North Of Tampa Fl
Looks like management is going to get a Arc Flash Study done in our plant . As this facility has been here since the early 80's would it not be prudent to also verify the ( AIC ) ratings of the breakers in the panel at the same time.I understand we have the series rated method in the plant . I know a lot of work has been done with no engineer input over the years .Does a Arc Flash study look at that at the same time ??????