Thirst4Knowledge
Member
- Location
- NEW JOISEY fugget about it!
Thank you in advance for any comments. I've been a long time reader of the posts but this is my first post. We built a small commercial service 120/208 3ph overhead. The Poco sent us a letter telling us the available fault current was 21,000. We installed 25,000 rated circuit breakers in a two meter modular stack. We then went to two MLO panels inside. The MLO panels branch circuit breakers are rated at 10k. We always do it this way, and we passed inspection without a problem. my question is why are we allowed 10k at the MLO's when we needed at least 21k outside?? You wouldn't have less AIC after the service disconnects. Again, Thanks