Existing MLO panel in the field is 100 amps, 120/208V, 10000 AIC rated panel. Upstream breaker feeding this from a distribution panel is rated at 65000 AIC.
The Inspector wants this panel to be rated at 22000 AIC. Do I have to change the panel or 65000 AIC rated upstream breaker is sufficient?
The Inspector wants this panel to be rated at 22000 AIC. Do I have to change the panel or 65000 AIC rated upstream breaker is sufficient?