Would like opinions on the following proposed install.
Planning on installing 60’ #1 SE aluminum cable. It will run from the load center to a j box and then transition to #3 copper and run 35’ to a disconnect mounted at the equipment.
This circuit will feed a 80 amp level 2 and will be protected with a 100A breaker.
Thanks