If the engineer is calling for a 400A switch in a switchboard to feed a 400A panel and VD is not an issue and they are calling for (2) sets of #500 is there any logical reasoning for this? Those feeders could handle 760A. Is it because of possibly changing things in future and installing equipment requiring more power and they would be covered?