K2X
Senior Member
- Location
- Colorado Springs
We are working on two hospital Operating Rooms with 2 isolation panels in each room. The men with sawzalls came through and did about a 35% demo to the rooms to add med gas etc, etc. My assignment was to get the isolation circuits back in place and working which went pretty smoothly and get the new lighting system piped and ready to install and that is going well too. What I'm a little concerned about is verifying that the gec's to the isolation panels are in place, (or maybe they are not called gec's on isolation panels?). I'm also seeing what may be some kind of bonding going on , maybe a bonding grid?, or maybe bonding the panels together? There is 1/2 inch emt running through the walls with only a # 10 green going through it. Some of this bonding got cut and I can't get the big picture because most of the walls are intact. I got the weekend assignment to research this installation. If anyone could point to some code articles that might help me get an idea what i might be looking for it would be appreciated. Thanks!