paul said:
However, the last one I did a couple months back was one of those new-fangled mudrings that actually attached to the stud, then the box mounted to it.
Seems like some of the prefab shops are using those quite a bit.
 
mdshunk said:
Seems like some of the prefab shops are using those quite a bit.

And that's exactly what it was. Our "big shop" side just LOOOOOVES to prefab. Then we, who are out in service, get to suffer on the changes.
 
mdshunk said:
macusqsi868742.jpg

http://www.youtube.com/watch?v=OSVjn0PF4x8

http://video.google.com/videoplay?docid=-6319450707241367244
 
paul said:
I put in a 3/4" rise and tighten it right down to the mudring. Hakuna Matata.

However, the last one I did a couple months back was one of those new-fangled mudrings that actually attached to the stud, then the box mounted to it.


who makes them? got a part number or a picture?
 
Done properly there is NO violation of 314.21.
Cut around the box exactly and there is NO 1/8" gap around the edge of the box.
I angle my saw so the cut out is even with the box edge.
 