I'm doing an arc flash study using SKM software. I have several switchboards with 3000 amp or 4000 amp Siemens WL circuit breakers which have ETU745 trip units.
Do I need to manually add the .05 second total clearing time of the breaker, or is that already included in the devices trip curve?
Do I need to manually add the .05 second total clearing time of the breaker, or is that already included in the devices trip curve?